asta-powerproject.de
Last scanned August 7, 2026
A cookie scan of asta-powerproject.de completed on August 7, 2026 found 1 cookies and 11 third-party tracking requests. The site uses Cookiebot as its consent management platform with Google Consent Mode v2; IAB TCF v2.3 was not observed. 11 third-party requests were detected from 3 vendors.
Consent behaviour grade
55 / 100
This site set tracking cookies or loaded trackers before the visitor consented.
Automated point-in-time check of the scanned pages; not legal advice. How our check works.
Consent enforcement level
-
1
Nothing non-essential runs before consent is given. This is the strict reading of ePrivacy Article 5(3) and the strongest position.
-
2
Google tags load with storage defaulted to denied and send only cookieless pings before consent. Permitted in Google's model, but not the strict reading of Article 5(3).
-
3
Partially enforced This site
Google Consent Mode v2 restrains Google tags, but other trackers or cookies were observed before consent.
-
4
Trackers or cookies execute before the visitor consents, with no consent signals restraining them.
Consent banner as encountered
The first layer offers a Reject option alongside Accept.
Load timeline before consent
Milliseconds from navigation start until each request fired or each cookie was set.
Observed before consent
Cookies set before consent (1)
-
wp_consent_functionalunknown
Tracking requests before consent (5)
- Google LLC www.googletagmanager.com at 700 ms
- Google LLC www.youtube.com set a cookie set by www.youtube.com/www-widgetapi.js · at 1130 ms
- Google LLC googleads.g.doubleclick.net set by www.youtube.com/m=root,base · at 1349 ms
- Google LLC pagead2.googlesyndication.com set by www.googletagmanager.com/js · at 1646 ms
- Google LLC region1.google-analytics.com set by www.googletagmanager.com/js · at 1653 ms
How we tested
Browser: Chrome/150.0.7871.124 · Scan origin: EU · Viewport: 1440×900 · Checked: 7 Aug 2026 09:16
Cookies
1
Third-party
0
Trackers
11
Vendors
3
Consent banner
Cookiebot
Scans
1
What this setup is missing
- Script blocking is manual. Each script must be tagged by hand, and untagged scripts run before consent.
- The published cookie declaration does not include all cookies observed on the site.
Compliance by audience
European Union
✗ Not metGDPR + ePrivacy · Prior consent (opt-in)
United Kingdom
✗ Not metUK GDPR + PECR · Consent-based
United States
✓ Meets this modelCCPA/CPRA + state laws · Notice & opt-out
Canada
! Needs attentionPIPEDA + Québec Law 25 · Consent-based
Brazil
! Needs attentionLGPD · Consent-based
Scanned from the EU; sites may serve different banners or tracking to other regions. Verdicts reflect observed behaviour measured against each audience's rules.
Connection security
HTTPS supported
✓Redirects HTTP to HTTPS
✓HSTS
✗Content Security Policy
✗
Third-Party Trackers
11 requests detected from 3 vendors: Google LLC, Cybot A/S (Cookiebot), UserCentrics
Third-Party Trackers
11 requests detected from 3 vendors: Google LLC, Cybot A/S (Cookiebot), UserCentrics
Analytics
1
Marketing
1
Necessary
5
Functional
0
Other
4
| Vendor | Category | Type | Domain |
|---|---|---|---|
| Google LLC before consent Google Tag Manager | Analytics | script | www.googletagmanager.com |
| Google LLC before consent YouTube embedded video | Marketing | iframe | www.youtube.com |
| Cybot A/S (Cookiebot) Cookiebot consent management | Necessary | script | consent.cookiebot.com |
| Google LLC Google Fonts files | Necessary | script | fonts.gstatic.com |
| Google LLC Google tracker domain (source: Disconnect.me, category: Content) | Necessary | script | i.ytimg.com |
| Google LLC Google tracker domain (source: Disconnect.me, category: Content) | Necessary | script | www.gstatic.com |
| Google LLC Google tracker domain (source: Disconnect.me, category: Content) | Necessary | script | jnn-pa.googleapis.com |
| Google LLC before consent Google tracker domain (source: Disconnect.me, category: FingerprintingGeneral) | Unknown | script | googleads.g.doubleclick.net |
| Google LLC before consent Google tracker domain (source: Disconnect.me, category: FingerprintingGeneral) | Unknown | script | pagead2.googlesyndication.com |
| Google LLC before consent Google tracker domain (source: Disconnect.me, category: FingerprintingGeneral) | Unknown | script | region1.google-analytics.com |
| UserCentrics UserCentrics tracker domain (source: Disconnect.me, category: ConsentManagers) | Unknown | script | consentcdn.cookiebot.com |
Scan history
One completed scan: cookies and trackers from the scan on August 7, 2026.
Recent scans
| August 7, 2026 | 1 11 |
More Cookie Compliance Reviews
Startseite - Hotel Astoria in Bad Füssing, Bayern
astoria-bad-fuessing.de
Hotel Rhönkitz - Stadthotel - Bar & Lounge
astoria-badkissingen.de
ASTORES
astores.de
SEFE Storage GmbH:: Wir speichern Erdgas.
astora.de
Zuverlässliche Zaunmontage in Nürnberg, Fürt...
astor-pro.de
Anfrage | Aston Martin Stuttgart
astonmartin-stuttgart.de
Home
astonmartin-mannheim.de
Asthma Selbsthilfegruppe Atemlos Münster – S...
asthma-shg-atemlos.de
Is asta-powerproject.de your website?
Claim it to monitor your cookies and trackers, set up a consent banner with automatic script blocking, and keep your cookie policy up to date.